Before you start.
What you are about to solve.
If a data point changes in an issued DeCA (electronic transport control document), correct the document through a procedure that leaves a trace of the change and keeps the original. In Cofactu, the New version action generates another PDF with its own URL and QR. The previous document stays part of the version chain.
A draft can be reviewed before issuing. An issued document requires a new version: editing a downloaded PDF or writing by hand on the driver's copy does not update the electronic document. The updated copy must reach whoever performs the transport.
This guide describes the correction inside Cofactu. The downloadable example at the end lets you compare two PDFs with fictitious data. It is not a real transport nor a form you can reuse to travel.
Do it in order.
Open only the step you are on.
6 steps to review, issue and leave the document ready, without reading a whole guide at once.
-
Open the document and check its status
Step 01: Open the document and check its status
Go to Logistics → DeCA and find the document by its number. Check the parties, the shipment and the date before acting: two similar services can have different documents. Open the record and check whether you are looking at a draft or an issued document.
- If it is a draft, review its data before the first issue.
- If it is already issued, check the history and work on the current version. If someone else corrected it while you were reviewing, reopen the current version before repeating the operation.
-
Identify the reason and use New version
Step 02: Identify the reason and use New version
From the issued DeCA record, open New version. The form asks for a reason and shows the data that can be changed for that case. Choose the one that describes what happened and add a specific explanation where appropriate, for example the replacement of the vehicle because of a breakdown.
- A vehicle change lets you record the previous plate, the new one and the time of the change.
- A weight correction requires reviewing the affected shipments, not replacing an overall figure without checking where it comes from.
- If the data point you need to correct is not available, stop the issue and check the applicable procedure. Do not use another field to simulate the change.
-
Review the data before confirming
Step 03: Review the data before confirming
Check the new fields against the information of the operation. For an articulated vehicle, also check the trailer or semi-trailer. If there are several shipments, check which origin, destination and goods belong to each. The correction must make it possible to understand what changed and which part of the document it affects.
-
Issue and open the PDF of the new version
Step 04: Issue and open the PDF of the new version
Confirm the operation when the data have been reviewed. Check that Cofactu shows the new version and open its PDF. Check the number, the version ordinal and the reason, as well as the corrected data. If the application reports an error, check the current status before repeating the confirmation.
- The link of the new PDF is different from the original link.
- The new QR must open that same PDF without requiring the driver or whoever checks it to log in.
- In the record history you can see the versions to reconstruct the change.
-
Give the driver the updated copy
Step 05: Give the driver the updated copy
Sharing the initial PDF is not enough after a correction. Get the new document or its QR to the driver and check that they can open it. If you use email delivery, check its result: an issued version and a delivered email are different facts. If sending fails, use the agreed channel to provide the correct copy.
- If the driver carries a printed copy, give them the updated copy with its QR.
- Coordinate the change with the other party so they do not keep distributing the previous version as if it were current.
-
Keep the history of the operation
Step 06: Keep the history of the operation
Keep the original document and the corrected version accessible within the file. A new version does not replace the need to keep traceability. If you download copies for your archive, label each version so that a file name does not cause confusion later.
- Check that the new version corresponds to the same document and service.
- If you receive a DeCA from another issuer, coordinate its correction with them: do not modify an external PDF on your own or present it as a version issued by Cofactu.
When you finish you will have a traceable correction, its PDF and QR checked and the updated copy available to the driver.
The questions that come up
when you put it into practice.
Does the same QR stay when I correct in Cofactu?
No. Cofactu generates a new PDF with its own URL and QR. The rule also allows other procedures, but this guide describes Cofactu's.
Can I write the new plate on the printed copy?
That note does not update the electronic DeCA. Use the correction procedure and give the driver the updated document.
Does a correction use up another manual issue?
Manual issuing is unlimited on every plan. Corrections are kept as versions of the document; they are not an extra quota of new documents.
Continue from here.
Without losing context.
Related to this task
- Compare the sample PDFsOriginal document and fictitious correction with different QR codes.↗
- Prepare the first DeCAParties, goods, vehicle and copy for the driver.↗
- Cofactu LogisticsConnects documentation, delivery and invoicing.↗
- Source: Resolution of 5 June 2026Sections five and seven: changes and the copy for the driver.↗
More Cofactu guides
Transport and DeCADepends on the service · Intermediate How to manage a transport job through to its invoice Organise a service in Cofactu: customer, stops, DeCA, driver, POD, incidents, costs and invoice draft. Check each stage before closing. Open the guide →
Transport and DeCA≈ 9 min · Beginner DeCA vs CMR vs e-CMR: differences explained (2026) Learn to tell DeCA, CMR and e-CMR apart in road freight: when each document applies, what it proves and how to avoid confusing a PDF, a consignment note and an e-CMR. Open the guide →
Transport and DeCA≈ 10 min · Intermediate How to get ready for eFTI in 2027: guide What eFTI changes on 9 July 2027, which Spanish documents are in scope (DeCA, ADR, combined transport) and how to prepare without giving up the PDF DeCA. Open the guide → 